An Integrated Simulation-Genetic Algorithm for the Stochastic Multi-Mode Resource Constrained Project Scheduling Problem

Yan LI

Abstract


This paper presents a simulation-genetic algorithm for the stochastic multi-mode resource-constrained project scheduling problem (SMRCPSP), in which multiple execution modes are available for each of the activities with random durations. A genetic algorithm combined with nonrenewable resource feasibility checking and topological sort procedure to find a near optimal sequence of tasks to be performed. Simulation is employed to evaluate the performance (makespan) of the sequence under stochastic duration conditions. Computational results for the SMRCPSP reveal that the proposed algorithm is effective in solving the problem.

Keywords


Resource-constrained project scheduling, Multi-mode; Stochastic activity duration, Genetic algorithm, Simulation


DOI
10.12783/dtcse/cst2017/12569

Refbacks

  • There are currently no refbacks.