Improvement and Simulation of Rear Axle Assembly Line Based on Plant Simulation Platform

Hong-Ying SHAN, Guang-Fu LU, Yi WANG

Abstract


In this paper, the rear axle assembly J Company A products to improve the object, simulation, assembly line balancing theory and heuristic search method for balancing the rear axle assembly improvement analysis. First, the reality of the assembly line, assembly line collection of information, and the status quo was Plant Simulation. Then, the application assembly line balancing theory and heuristic methods to improve and assembly lines for simulation. By comparing the simulation results before and after the improvement from the original amount of the rear axle assembly line worker 17 people down to 15 people, the equilibrium rate rose from 69.75% to 79.85%, the balance delay rate dropped to 20.15 percent from 30.25, assembly efficiency is improved.

Keywords


Assembly Line, System Simulation, Heuristic Balance


DOI
10.12783/dtetr/icmeca2017/11943

Refbacks

  • There are currently no refbacks.