Research on the Scheduling Information System of Measurement Test Business Based on .NET

Feng-Wei WANG, Huan ZHANG, Na LIU, Yue WANG

Abstract


The Measurement test business scheduling work is very complicated because of the cooperation with various people and large amount of data need to be considered. In order to change the traditional manual management way and relief from complex analysis of massive data, this paper analyzes the work flow combined with the scheduling work management experience, introduces a high degree of information sharing and effective use of massive information resources information management system. With the system, the staff can create a test plan based on historical data, arrange the on-site test plan including times, places and persons involved, see the test execute result and so on. The application proves that the information management method can effectively improve the communication efficiency and the timeliness of Measurement test service scheduling; it is very suitable for the promotion of the measurement technology institutions.

Keywords


Measurement and test service, Scheduling, Client Automatically Upgrade

Publication Date


2016-11-30 00:00:00


DOI
10.12783/dtetr/ssme-ist2016/4008

Refbacks

  • There are currently no refbacks.